Construction of a 120 kV power line to connect the Windfall mine
Information on the project
Proponent
Hydro-Québec
Administrator
Provincial Administrator
Reference number
3214-09-029
Subscribe to the email alerts for this project
Do you need more information ?
Contact-us by e-mail at [email protected]
Summary
With this project, Hydro-Québec plans to build an electric power transmission line with a voltage of 120 kV, over a distance of more or less 95 km in order to connect the future Windfall mine, a gold project owned by the Minière Osisko Inc. The project consists of first connecting the existing facilities to the Hydro-Québec transmission network, and secondly, supplying the operating activities.
Documents
Preliminary information
Table provided by MELCC
Disclaimer
Some of the information on this website may have been supplied by external sources. The Evaluating Committee assumes no responsibility for the accuracy, timeliness or reliability of information supplied by external sources. Users wishing to rely on this information should consult directly with the appropriate source.