Connecting the Rose Lithium-Tantalum mine and relocating a segment of the 315-kV line project
Information on the project
Proponent
Hydro-Québec
Administrator
Provincial administrator
Reference number
3214-09-028
Subscribe to the email alerts for this project
Do you need more information ?
Contact-us by e-mail at [email protected]
Summary
The project consist of relocating a segment of just over 4 km from the 315-kV line to bypass the future site of the mine. For electricity supply, Hydro-Québec plans to connect the mine to the 315-kV line. A 315/25-kV transformer substation will be built and located west of the connection point (exact location to be determined).
Documents
Preliminary information
Table provided by MDDELCC
Disclaimer
Some of the information on this website may have been supplied by external sources. The Evaluating Committee assumes no responsibility for the accuracy, timeliness or reliability of information supplied by external sources. Users wishing to rely on this information should consult directly with the appropriate source.