Concrete waste storage and conditioning Project at km 598 of the Billy-Diamond Highway
Information on the project
Proponent
Excavation Taïga inc.
Administrator
Provincial Administrator
Reference number
3214-16-087
Subscribe to the email alerts for this project
Need more information ?
Contact us by email at [email protected]
Summary
The project consists of storing and refashioning up to 1500 m3/year of concrete, cement and bituminous concrete residues on a 1.14-hectare quarry owed by the proponent and for which a certificate of exemption was issued on March 28, 2019. The demand for granular material is growing and, according to the proponent, this project will provide an alternative material while reducing the quantity of concrete waste in landfills and the emission of greenhouse gases related to the transportation of such waste to the south and new granular material to the north. The concrete waste will be transported to the quarry for storage on a watertight surface, with runoff control. The concrete residues will be broken up with either a jackhammer or a crusher, depending on the size of the pieces, to produce different types of gravel that will be separated by sieving.
Documents
Preliminary information
Table provided by MELCCFP
Disclaimer
Some of the information on this website may have been supplied by external sources. The Evaluating Committee assumes no responsibility for the accuracy, timeliness or reliability of information supplied by external sources. Users wishing to rely on this information should consult directly with the appropriate source.