Expansion of an existing quarry and reopening of an old sand quarry at km 58 of route 19900, which connects Lebel-sur-Quévillon and Matagami
Underground exploration ramp with underground drilling and bulk sampling for area 51 of the Fénelon project
Operation of a new quarry and a mobile bituminous concrete plant located at km 35,5 of James Bay Road
Operation of quarry and operation of an asphalt concrete plant near the James Bay Road at km 125 by Trimix béton inc.
Installation and operation of an asphalt concrete plant near the James Bay Road at km 85 by Trimix béton inc.