Billy-Diamond Highway and Chisasibi road maintenance and rehabilitation work 2023/2024

Information on the project

Proponent

Société de développement de la Baie-James

Administrator

Provincial Administrator

Reference number

3214-05-81

Subscribe to the email alerts for this project

Need more information ?

Contact-us by email at [email protected]

Summary

The proponent is planning road maintenance and rehabilitation work at km 453 and 454 of the Billy Diamond Highway (RBD) and km 37 and 65 of Chisasibi Road (CHC). The planned work will require a large supply of granular materials and thus, require the opening of two new quarries along the RBD. These new quarries are located near the RBD, but access roads (450 meters and 140 meters) as well as work areas for equipment are to be expected. The opening of two new quarries will also be necessary for the work on the CHC. Road access for these quarries are already present as former quarries are located near to the rocky outcrop that will be exploited. The old platforms of these older quarries will be used for the equipment work areas, which would further avoid encroachment. The proponent is planning to operate a mobile asphalt concrete plant until the completion of the work for each of the targeted sites.


Documents

Preliminary information

Additional information

Table provided by MELCCFP



Disclaimer

Some of the information on this website may have been supplied by external sources. The Evaluating Committee assumes no responsibility for the accuracy, timeliness or reliability of information supplied by external sources. Users wishing to rely on this information should consult directly with the appropriate source.