Exploration and development of the Fenelon deposit
Information on the project
Proponent
Wallbridge Mining Company Limited
Administrator
Provincial administrator
Reference number
3214-14-038
Subscribe to the email alerts for this project
Do you need more information ?
Contact-us by e-mail at [email protected]
Summary
Wallbridge Mining Company wishes to proceed with development work on the Fenelon deposit. The project first plans the dewatering and dry maintenance of the pit, ramp and sites developed in the past. Then, the project plans to take a bulk sample between 30,000 and 35,000 mt. The project provides for the use of existing equipment on the site. However, a new sedimentation basin with a capacity of 518 m3 will be developed to dewater the mine. The time required to dewater the mine is estimated at 86 days. For bulk sampling, there will be no long term storage of the ore. The mined ore will be trucked to the Camflo plant in Val-d’Or for processing. Underground development will create waste rock, but it will be used for stabilization purposes. No sterile material will be stored on the surface.
Documents
Preliminary information
Additional information
Table provided by MDDELCC
Disclaimer
Some of the information on this website may have been supplied by external sources. The Evaluating Committee assumes no responsibility for the accuracy, timeliness or reliability of information supplied by external sources. Users wishing to rely on this information should consult directly with the appropriate source.