Upgrading of drinking water pumping station Waswanipi
Information on the project
Proponent
Cree Nation of Waswanipi
Administrator
Regional administrator
Reference number
3214-11-099
Subscribe to the email alerts for this project
Do you need more information ?
Contact-us by e-mail at [email protected]
Summary
The Cree First Nation of Waswanipi plans to largely dismantle the existing pumping station building and a hangar and plans to clean up the site. The community is also planning the construction of the new pumping station of approximately 16 m x 10 m. The new building will also include the water treatment system equipment. A new walk-in generator installed on an exterior concrete slab will replace the current generator, which has insufficient capacity. Finally, the civil works will include: connections of new facilities (raw water line, pumping station, underground connection, etc.) and the installation of fences to restrict access to pumping stations, reservoirs and wells. In addition, the space and infrastructure needed for the installation of a future chlorine disinfection system are planned in the new pumping station building in case the disinfection be necessary or desired by the community in the future.
Documents
Preliminary information
Attestation of exemption
Disclaimer
Some of the information on this website may have been supplied by external sources. The Evaluating Committee assumes no responsibility for the accuracy, timeliness or reliability of information supplied by external sources. Users wishing to rely on this information should consult directly with the appropriate source.