Environmental remediation project of the former Lac Pau petroleum depot, the former KA-5 cement plan and the former Bowen contractor area
Development and operation of two (2) quarries located at km 28 of the Laforge-1 road and km 446 of the Transtaïga road
Construction of a steel arch structure at km 19.8 of LA1 Road to the Laforge 1 Dam (Phase 2) by Société de développement de la Baie-James
Operation of quarry at km 85.5, operation of a mobile asphalt concrete plant on the quarry site at km 85.5 and operation of a quarry at km 168 of the James Bay Road